A full set of final architectural and structural drawings was requested by the Selectboard in June 2014. These detailed architectural drawings are available in pdf format. The plans include balcony and stage strengthening, an elevator and a handicap-accessible bathroom, as well as bringing the building completely up to all fire and safety codes. The outside fire escapes will be removed and new stairwells added. Not only will the upstairs floor become usable once again, but the layout and functionality of the town offices and work spaces will be improved.